Hard Rock Stadium (Lobby)

Project carried out in June / July 2016 in an approximate period of 60 days.

The General Project Management was carried out by Herman Construction and consisted of the remodeling of the lobby's floor (5,000 sf) which was done by placing tiles of 7 different sizes forming squares of 8 x 8 sf and then installing these one next to another until covering the entire surface. Once installed the whole area, the end was done in apoxi grout.