Hard Rock Stadium (Mexican Restaurant)

Project carried out in July / August 2016 in a period of approximately 30 days.

The Project consisted in the coating of the bar counter situated at the heart of the restaurant (700 sf) with 8x8" Mexican slabs of different shades of green, and the floor done with 2x3"  travertine marble (2000 sf).