Griffin Pointe

Project carried out between October 2018 / January 2019 in a period of approximately 60 days.

The General Direction of the Project was carried out by Hernandez Construction Co. and consisted in the installation of the entire floor in the lobby area and corridors in porcelain of 24x24" (1500 sf), installation of floors and walls in 14 bathrooms in porcelain of 12x24" (2500 sf), and two backsplash (60 sf) on a glass tile.