200 E Las Olas Boulevard

Project carried out in June / July of 2017 in an approximate period of 40 days including demolition, installation and polishing of the marble once installed.


The Project was conducted under the general supervision of Mike Miller (Stiles Construction Co.) and consisted of the remodeling of the lobby floor including corridors and elevators (approximately 2000 square feet).


We used two different types of marble (ivory cream and limestone dark) on which we had to do a lot of work to achieve that the circle perfectly matches both in size and location with respect to plans and furniture made in combination.

Project by :

Show More
  • Facebook Black Round
  • Twitter Black Round
  • Instagram - Black Circle

© 2019 by Mariano Doncel. Proudly created with Wix.com